Top Page | English | 简体中文 | 繁體中文 | 한국어 | 日本語
Friday, 11 May 2018, 13:01 HKT/SGT
Share:
    

Source: Mitsubishi Power
MHPS Signs Contract with CEPC for Rehabilitation Project of Cairo West Power Station in Egypt
- Rehabilitation Project to Ensure Stable Operation and Greater Reliability of Four Natural Gas and Heavy Fuel Oil-fired Boilers -

TOKYO, May 11, 2018 - (JCN Newswire) - Mitsubishi Hitachi Power Systems, Ltd. (MHPS) has signed a contract with Cairo Electricity Production Company (CEPC) for the renewal of the Cairo West natural gas and heavy fuel oil-fired thermal power plant. MHPS will renew four existing power generation boilers with a rated output of 1,360 MW, extending their lifetime and enhancing reliability. The project will contribute to a more stable energy supply in Egypt.

The Cairo West power station is located around 16km northwest of Cairo, and is operated by CEPC. The rehabilitation project was awarded to a consortium that included MHPS' Egyptian subsidiary. MHPS will manufacture the boiler components at its Kure Works, and MHPS' Egyptian subsidiary will dispatch the engineer for support of installation and trial operation. The four existing boilers are the No. 5 and No. 6 units (rated output of 330 MW) supplied by MHPS in 1993, and the No. 7 and No. 8 units (350 MW) supplied in 2011.

The Cairo West power station is one of the mainstay facilities providing power to the Egyptian capital of Cairo where electricity demand is high, so a stable power supply is critical. The renewal contract from CEPC follows the contract in August 2017 for upgrades to a natural gas-fired gas turbine combined cycle (GTCC) power station at the Cairo North facility.

MHPS, in addition to promoting the adoption of new thermal power generation systems, also focuses on renewal and performance upgrades for existing conventional power generation facilities and GTCC plants like those at CEPC. Going forward, through its support for more stable and efficient power generation around the world, MHPS will contribute to economic development and highly sustainable energy production on a global scale.


Contact:
Joseph Hood, PR Manager
Mitsubishi Heavy Industries, Ltd.
Email: mhi-pr@mhi.co.jp
Tel: +81-(0)3-6716-2168
Fax: +81-(0)3-6716-5860


Topic: Press release summary
Source: Mitsubishi Power

Sectors: Energy, Alternatives
http://www.acnnewswire.com
From the Asia Corporate News Network


Copyright © 2024 ACN Newswire. All rights reserved. A division of Asia Corporate News Network.



Mitsubishi Power
Apr 9, 2024 14:04 HKT/SGT
Mitsubishi Power Receives Order from HK Electric for Natural-gas-fired GTCC Power Generation Equipment
Mar 15, 2024 17:34 HKT/SGT
Mitsubishi Power Achieves #1 Global Gas Turbine Market Share in 2023
Oct 31, 2023 15:49 HKT/SGT
Mitsubishi Power and Egypt Ministry of Electricity and Renewable Energy Sign Upgrade and Reliability Agreement Extension for Sidi Krir and El-Atf Power Plants
Sept 1, 2023 12:37 HKT/SGT
Mitsubishi Power Hosts First Seminar with Government and Industry Leaders to Explore Technologies for Philippines' Energy Future
Mar 3, 2023 15:22 HKT/SGT
EPC Consortium of Mitsubishi Power, TIC and Sargent & Lundy to Build Entergy Texas' New, Cleaner and More Reliable Power Station
Aug 24, 2020 10:32 HKT/SGT
MHPS Receives Order for Three M701JACs Advanced Air-cooled Turbines for a United Arab Emirates Project
Aug 4, 2020 14:19 HKT/SGT
MHPS Receives Contract for AQCS Equipment for a Chemical Plant in Poland
July 31, 2020 15:02 HKT/SGT
MHPS to Change Company Name to "Mitsubishi Power"
May 20, 2020 09:09 HKT/SGT
MHPS Captures Global Gas Turbine Market Share Leadership Again
Apr 24, 2020 12:59 HKT/SGT
MHPS Announces New Company Name "Mitsubishi Power"
More news >>
 News Alerts
Copyright © 2024 ACN Newswire - Asia Corporate News Network
Home | About us | Services | Partners | Events | Login | Contact us | Privacy Policy | Terms of Use | RSS
US: +1 214 890 4418 | Beijing: +86 400 879 3881 | Hong Kong: +852 8192 4922 | Singapore: +65 6549 7068 | Tokyo: +81 3 6859 8575

Connect With us: