Top Page | English | 简体中文 | 繁體中文 | 한국어 | 日本語
Thursday, 23 April 2020, 00:00 HKT/SGT
Share:
    

Source: Compressor Controls Corporation
Market Leader in LNG Turbomachinery Controls Awarded Multiple Arctic LNG 2 Contracts
Compressor Controls Corporation looks to replicate success of Yamal LNG turbomachinery control strategy in latest Arctic region project

Yamalo-Nenets Autonomous Okrug, Russia, Apr 23, 2020 - (ACN Newswire) - Compressor Controls Corporation (CCC), the global leader in liquefied natural gas turbomachinery controls and a division of Roper Technologies Inc., has been awarded multiple contracts for the Arctic LNG 2 project. The contracts represent the latest collaboration between Novatek and CCC, which previously worked together on turbomachinery optimization and standardization for the Yamal LNG project.

A major LNG development located in the Yamal-Nenets Autonomous Region's Gydan Peninsula, the Arctic LNG 2 project boasts an expected production capacity of 19.8 million tons per year. In CCC, Novatek has selected the world's leading turbomachinery controls expert-one that has its controls on 95.5% of the global LNG market's MTPAs.

Under the contracts, CCC will oversee the turbomachinery controls and optimization of all three 6.6 MTPA LNG trains' centrifugal compressors and expanders. In addition to spearheading anti-surge, performance, quench and other advanced controls, CCC will provide an emulator for use during the plant simulation and its eventual OTS. The company will leverage specialized local and global teams, and collaborate with the field's leading OEMs, to execute and deliver state-of-the-art control algorithms.

"These contracts recognize CCC's performance on the Yamal LNG project and allow us to continue strengthening our partnership with Novatek," said CCC Director of Global Projects, Osama Abou Shabab. "We're proud that Novatek has entrusted our global team to control all critical and non-critical machines in its hallmark Arctic LNG 2 project. CCC's field-tested, proven control techniques and algorithms will maintain and improve the project's targeted RAM."

The Arctic LNG 2 project includes constructing three LNG trains at 6.6 million tons per annum each, using gravity-based structure (GBS) platforms. The project is based on the hydrocarbon resources of the Utrenneye field. As of Dec. 31, 2018, the Utrenneye field's 2P reserves under PRMS totaled 1,138 billion cubic meters of natural gas and 57 million tons of liquids. Under the Russian classification, reserves totaled 1,978 billion cubic meters of natural gas and 105 million tons of liquids.

Project participants include NOVATEK (60%), Total (10%), CNPC (10%), CNOOC Limited (10%) and the Japan Arctic LNG, consortium of Mitsui & Co and JOGMEC (10%). OOO Arctic LNG 2 owns an LNG export license.

Visit novatek.ru/en/business/arctic-lng to learn more about the Arctic LNG 2 project. For more on CCC and Novatek, visit cccglobal.com and novatek.ru.

About CCC

CCC is the leader in turbomachinery train optimization services for the upstream, midstream and downstream oil and gas industry. Engineers and plant managers optimize plant efficiency every day utilizing CCC's expertise. Since 1974, over 37,000 installations have benefited from over two billion hours of CCC's operational experience. This expertise is codified in a comprehensive platform of hardware, software and consulting services that optimize turbomachinery to increase yield, reduce downtime and enhance plant safety.

Contact:
Shady Tawfik
+971-2-446-9671
stawfik@cccglobal.com

Related Links
- Arctic LNG 2 project https://www.newsfilecorp.com/redirect/B02LH84K
- CCC https://www.newsfilecorp.com/redirect/5QreUKPJ

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/54751


Topic: Contract Awarded
Source: Compressor Controls Corporation

Sectors: Energy, Alternatives, Engineering, Oil & Gas
http://www.acnnewswire.com
From the Asia Corporate News Network


Copyright © 2025 ACN Newswire. All rights reserved. A division of Asia Corporate News Network.



Latest Press Releases
Taxinexo Advances Large-Scale Commercial Deployment of Level 4 Autonomous Vehicles Across the United States  
Dec 26, 2025 22:00 HKT/SGT
Honda Newly Launches "Discover Honda" Content Curation Media Platform  
Friday, December 26, 2025 4:34:00 PM
Mazda Selected for A List in CDP Water Security for the First Time  
Friday, December 26, 2025 4:19:00 PM
Fujitsu Develops Fujitsu Kozuchi Physical AI 1.0 for Seamless Integration of Physical and Agentic AI  
Friday, December 26, 2025 1:04:00 PM
Establishment of DOCOMO Innovation Fund IV, a Corporate Venture Investment Fund  
Friday, December 26, 2025 12:53:00 PM
The General Incorporated Association Generative AI Japan Announces the Winners of the Japan Generative AI Award 2025  
Friday, December 26, 2025 10:00:00 AM
BCQ (01963.HK) to Pay RMB 585 Million Cash Dividend, Driving Share Price and Yield Upside  
Dec 25, 2025 17:23 HKT/SGT
Avantor Appoints Gladys Wang as Vice President, Bioprocessing Commercial, Asia, Middle East & Africa  
Dec 24, 2025 12:20 HKT/SGT
AEON Credit Service Net Profit Surges 28.1% to HK$352.7 Million for First Nine Months of FY2025/26  
Dec 23, 2025 22:07 HKT/SGT
Tohoku University and Fujitsu utilize Causal AI to discover superconductivity mechanism of promising new functional material  
Tuesday, December 23, 2025 1:58:00 PM
More Press release >>
 Events:
More >>
 News Alerts
Copyright © 2025 ACN Newswire - Asia Corporate News Network
Home | About us | Services | Partners | Events | Login | Contact us | Privacy Policy | Terms of Use | RSS
US: +1 214 890 4418 | China: +86 181 2376 3721 | Hong Kong: +852 8192 4922 | Singapore: +65 6549 7068 | Tokyo: +81 3 6859 8575

Connect With us: